Office building in Hausleiten, 2021

For STRABAG we have designed an architecturally interesting office building
directly printed the first building in Austria.

In Lower Austria, we constructed a 125 m² office building as an extension to an asphalt mixing plant for STRABAG SE. The country's first 3D-printed building was completed in just 45 hours. A printing material from Holcim was used, which played a key role in the successful implementation. The structures of the concrete print were deliberately left visible, giving the building a unique appearance not only in its form but also in its surface.

Location
Project category

Commercial building

Pure printing time

45 hours

Project participants

STRABAG SE

Planning office Mense-Korte

Holcim

IMPRESSIONS OF THE PROJECT IMPLEMENTATION

3D printing is coming to Austria

2.jpg

Precision meets speed

The configuration of the COBOD BOD 2 3D printer was adapted to the project requirements and made it possible to construct the office building in a single printing phase. The unique architecture with curved walls would have been very difficult to realize using conventional construction methods.

Precision meets speed

The three-layer wall structure was created by the 3D printer in just 45 hours. One of the hollow chambers was filled with insulation material, while the other was filled with in-situ concrete at structurally relevant locations.

3.jpg

Insights into the project process

From the construction of the printer to the final printing layer: Here you will find exciting insights into the project process.

Automation to the power of three

The completed office building impresses with its organic shapes in the interior and uses the printed structure of the walls to create visual accents.

5.JPG

Requirements and solutions

Requirements

As the first 3D-printed building, we also had to obtain the first building permit for such a building. We also had to try to keep the printing time as short as possible to ensure a fast project completion.

Solutions

To ensure compliance with building regulations and technical standards, close collaboration was carried out with local authorities to ensure that all legal permits were granted for the first 3D-printed building in Austria. Holcim's Tector Print printing material, specially developed for 3D printing, met the specific requirements of 3D concrete printing, including stability and durability.

Customer benefit

With the office building in Hausleiten, we brought 3D printing to Austria together with the project partners involved and created additional jobs for STRABAG SE, reflecting the company's innovative strength. We also demonstrated once again the architectural design freedom enabled by 3D building printing.

HERE EVERYTHING INTERLOCKS

Products in use

cobod_bod2_teaser.jpg

COBOD BOD2 3D construction printer

The BOD2 is one of the fastest and most versatile 3D construction printers on the market and impresses with its modular design, high printing speeds and unique tangential control.

Product_teaser_implementation_planning.jpg

3D printing execution planning

Advice on construction and implementation planning
as well as support in creating printable 3D models

Product_teaser_material planning.jpg

Material advice and planning

Determination of optimal material planning in interaction
with the given project requirements.

onsite_support_teaser.jpg

Project support

If you want everything to run smoothly even on your first project, PERI 3D Construction is happy to help. We provide support directly on your construction site with experienced personnel.

IF YOU ARE NEARBY

Here you can find the project

MORE INFORMATION ABOUT THE PROJECT

Download press kit

BE THE FIRST TO KNOW ABOUT NEW PROJECTS

Subscribe to the newsletter

bottom of page